Bottom-up, activity-based inventory of a 900-bed tertiary hospital in Hyderabad, India, for financial year 2024 — built to the GHG Protocol corporate standard and the Health Care Without Harm Climate Impact Checkup methodology.
| Scope / category | tCO₂e | % of total | Status |
|---|---|---|---|
| Scope 2 — purchased energy | 7,004.95 | 74.40% | Quantified |
| Purchased electricity | 7,004.95 | 74.40% | Quantified |
| Purchased steam, heat & cooling | 0 | — | Not occurring |
| Scope 3 — other indirect | 1,493.02 | 15.80% | Partial |
| Electricity transmission & distribution losses | 1,354.09 | 14.40% | Quantified |
| Off-site waste treatment | 138.94 | 1.50% | Quantified |
| Extra supply chain (procurement) | 0 | — | Not estimated |
| Business travel / employee / patient commuting | 0 | — | Not estimated |
| Inhalers (MDI / DPI) | 0 | — | Not estimated |
| Scope 1 — direct | 921.95 | 9.80% | Partial |
| Fugitive — medicinal & anaesthetic gases | 867.44 | 9.20% | Quantified |
| Stationary combustion (boilers, DG sets) | 51.58 | 0.50% | Quantified |
| On-site waste treatment (composting) | 2.93 | 0.03% | Quantified |
| Mobile combustion (owned fleet) | 0 | — | Not estimated |
| Cooling & fire suppression (refrigerants) | 0 | — | Not estimated |
| Total FY2024 footprint | 9,419.92 | 100.00% |
Note: the report prints Scope 1 as 921.99 tCO₂e in one table (p.36) and 921.95 tCO₂e elsewhere (pp.38, 42). The reconciled figure used here is 921.95, which sums exactly with Scope 2 and Scope 3 to the stated 9,419.92 t total.
| Waste stream | tCO₂e | % of waste | Boundary | Basis |
|---|---|---|---|---|
| Solid waste disposal (landfill) | 104.27 | 73.5% | Off-site, Scope 3 | CH₄ from anaerobic decay, 30-yr emissions booked upfront |
| Incineration — clinical / biohazardous / hazardous | 34.67 | 24.4% | Off-site, Scope 3 | 0.7 kgCO₂e/kg, fossil carbon fraction only |
| Composting | 2.93 | 2.1% | On-site, Scope 1 | Reported separately from the Scope 3 waste line |
| Total waste-related emissions | 141.87 | 100% | 1.51% of the facility footprint | |
Segregation is the leverage point, not tonnage: every kilogram shifted out of the incineration stream into recycling avoids 0.7 kgCO₂e, and avoided procurement of single-use items removes emissions upstream of the waste stream entirely.
| Lever | Addresses | Indicative cost | Indicative return |
|---|---|---|---|
| Rooftop solar + renewable PPA | Scope 2 (74%), T&D losses | ₹35–40 lakh | ₹9–10 lakh/yr saved; 4–5 yr payback |
| Energy efficiency: LED, HVAC controls, efficient medical equipment | Scope 2 | Not costed in report | Cuts the same kWh base solar must cover |
| Low-GWP anaesthetic substitution + gas capture | Scope 1 (9.2%), 867 tCO₂e | Protocol change | ~150% ROI over 3 years |
| Waste segregation, reduction, non-burn treatment | Scope 3 waste (1.5%) + avoided procurement | Training & process | ₹2–3 lakh/yr saved |
| Green procurement criteria for suppliers | Unquantified supply chain | Policy only | Avoided carbon liability, not cash yet |
Headline target in the report: 30–40% reduction over 3–5 years. The corridor above is illustrative, built from that stated range — it is a planning envelope, not a modelled forecast.
| Design choice | What was applied |
|---|---|
| Approach | Bottom-up, activity data × emission factor, per GHG Protocol and HCWH Climate Impact Checkup |
| Emission factors | Grid 0.727 kgCO₂e/kWh (CEA Baseline v20.0, Dec 2024); diesel 2.68 kg/L; LPG 2.983 kg/kg; desflurane GWP 2,540; isoflurane 510; waste incineration 0.7 kg/kg (CPCB 2023) |
| Anaesthetic activity data | 130 kg CO₂ (~66,327 L) and 46 kg N₂O (~24,892 L) consumed in the reporting period |
| Derived electricity | 7,004.95 t ÷ 0.727 kg/kWh ≈ 9,635 MWh annual consumption (implied, not metered in the report) |
| Intensity denominators | 3,24,690 patient encounters (29.0 kgCO₂e each); 900 beds (10.5 tCO₂e/bed); 56,868.7 m² (0.166 tCO₂e/m²) |
| Known limitations | Single-year snapshot, no base-year trend, no uncertainty or assurance, six Scope 3 categories unquantified, refrigerant and fleet emissions absent |